Always use Good quality of cement (Different grades of cement) as well as good quality sand. Type of material. 11-26 Appendix-II Recommended Mix Proportions. Uncategorized plaster volume calculator. So let’s Start Consider a 10 square metre area for 13 mm thick plaster. It could be used to monitor the labor performance, or to estimate the manpower required for a project for planning and monitoring purposes or for cost estimations. Cost of 1 ft2 is approx 15 rupees. According to the reference of IS code 1661:1972, plaster with different numbers of coat and their relative thickness are mentioned below. 1) Plastering with any mortar 12mm (5”) thick – 3 masons, 3 mazdoors and 1 bhisti can plaster 40sqm (400a ft) per day. Lets us assume that we need workout rate analysis for 10 Square metre area of inner plastering work. STEP 1 – Mortar Mix Material Calculation. Download: Use this plaster calculator offline with our all-in-one calculator app for Android and iOS. Its curing is done in the same manner as normal cement plaster. The capacity of ... Plastering with any mortar 12mm (5”) thick – 3 masons, 3 mazdoors and 1 bhisti can plaster 40sqm (400a ft) per day. PDF. (10 sq.mtr) area of 12 mm thickness = 10 x 0.012 = 0.12 cum. Then cost of plaster is fixed for thickness of plaster is different of 12 mm and 10 mm. n2 - 15 mm thick lime plaster 1 lime : 1 surkhi : 1 sand. Subtotal material cost = cement cost + sand cost = 28 + 25 = INR 53. DPC full form in construction and waterproofing, How much cement sand & aggregate required for M20 concrete, How much cement required in 1750 sq.ft for roof slab casting, Minimum thickness of RCC slab as per IS 456, Minimum flooring thickness in any residential building, Unit Weight of different material used in civil construction, Minimum size of RCC column as per IS 456…, Minimum thickness of RCC slab as per IS 456…, Minimum flooring thickness in any residential building…, Unit Weight of different material used in civil construction…, Labour rate for building construction in India…, Plaster cost per square foot with material in India…. Overhead & Profit Item No. ... 3 3 Coat Snowcem Cement Ext. n3 - 18 mm thick lime plaster 1 lime : 1 surkhi : 1 sand. ● Step 1 : Dry volume of cement mortar :- consider we have plastering area 1m2 and their thickness is 6mm, now calculate wet volume of cement mortar = 1×0.006 = 0.006m3. quantity of cement and sand required for 1m3 for various proportions, i.e., CM 1:2, 1:4, 1:6, 1:8 etc. Steel calculation formula in excel – 100% Free Download, Types of steel bars used in construction- Characteristic strength of steel. Smooth sides of walls: Keep the thickness 12mm for the smoother sides of walls with 1:4 ratios. In this post, we had listed out the approx labour requirement for civil works and also Labour output per day for different works.. Suppose 5% of wastage of cement mortar during plastering work,so 5% of 0.012 = 0.0006m3, then total wet volume of cement mortar = 0.012 + 0.0006 =0.0126m3. Thickness of Plaster = 12 mm = 0.012 meter, Volume of mortar = Plastering Area x Thickness of plaster = 100 x 0.12 = 1.2 meter cube, 10% Extra for uneven surface = 1.2 + 10 % 0f 1.2 = 1.32 meter cube, 30 % extra for dry volume mortar = 1.32 + 30 % of 1.32 = 1.72 meter cube, Therefore total volume of mortar become = 1.72 meter cube. ● step 4 :- labour rate and charges:- labour rate and cost for ceiling plastering is INR 12 to 15 per sq ft or INR 130 to 161 per sq m, consider labour rate and cost in this calculation is INR 140 per sq meter. ADD COMMENT 0. written 2.3 years ago by Sayali Bagwe • 5.8k: 15mm Thick plastering. In the previous article, I had discussed Rate analysis for Concrete. coverage rate of 1.0 kg./sq.m. Volume of Sand = 1.72/(5+1) x 5 = 1.43 meter cube. At CivilSir, we share all the information related to civil engineering. Thus to do 100 sq.ft.plaster (12mm thick) with … The rates of these labors for 8 hours are also provided. ( full rate analysis program + specs in sra ) n1 - 12 mm thick lime plaster 1 lime : 1 surkhi : 1 sand. Ans. For wall plaster generally ratio we use = 1: 6 (1 part of cement and 6 part of sand). Step-3: Calculate Plaster volume required. So other total expenses is about 15%, so others expenses 15% of 233 = INR 47. Again converting weight of cement into numbers of bags for easy calculation of rate. Rate per sq m for 20mm (1:6) external plaster include quantity of cement sand and water And Labour expenses, now do the following step calculation find out post and quantity of cement sand used in plastering. Step-4: CalculateMaterials required for the plaster volume Quantity of cement = 1/7×0.02793m3 ×1440m3/kg = 5.7456 Kg, if market rate of cement is rs 8 per kg, then cost of 5.7456 kg cement = 5.7456 × 8 = INR 46. 3) Painting two coats such as chocolate, red, grey, etc on wood are steel –3 12–18 per sq ft **Note: When plastering in m-sand you will have to use special additive like Razon Master Plaster MPCS 102 For good working, waterproofing and crack free plaster. This calculation calculates of cement, sand (Plaster = […] Fix the chicken mesh on joint of R.C.C. plaster volume calculator. plaster volume calculator. Total cost and rate of 20mm (1:6) thick plaster per sq meter is INR 360 or INR 34 per sq ft. Rate per sq m for 12mm (1:6) internal plaster include quantity of cement sand and water And Labour expenses, now do the following step calculation find out post and quantity of cement sand used in plastering. Different between slow sand filter(SSF) and rapid sand filter(RSF). In terms of a per square metre rate, expect: hard plaster rates to range from $20 to $70 per square metre; wet plaster rates to be range from $45 to $90 per square metre; You can expect to be quoted a flat fee for a room or house - a figure which does not include removal of existing plaster and does not take into account difficult access. These information are collected from a standard DSR book. Plastering cost per sq ft in india:-Total plastering cost includes labour cost, material cost, overhead expenses, equipment & tools & contractor profit. Suppose 5% of wastage of cement mortar during plastering work,so 5% of 0.006 = 0.0003m3, then total wet volume of cement mortar = 0.006 + 0.0003 =0.0063m3. It is useful for Consultants, Contractors, Architects and Builders for preparing the Rate Analysis of items like Concrete, Brickwork, Plaster etc. 11-26 Appendix-II Recommended Mix Proportions. Add 10% for contractor’s profit Power consumption 4. & masonry wall, ... PLASTERING WORK RATE ANALYSIS. All calculations of Plaster for rate analysis. Uncategorized >. The quantity of cement mortar required will be: 2 x 1.5 x (20/1000) = 0.06 m3 of mortar. Total ( A + B ) = Rs. Rate analysis for 12mm (1:6) thick plaster per sq meter. Quantity. Rate analysis for plastering work comprise of quantity and cost of material cement sand and water, cost of equipment and tools, overhead expenses, water charges,labours charges & contractor profit. Thus to do 100 sq.ft.plaster (12mm thick) with 1:4 proportion, the individual material required are . Construction Productivity Rates are very important to both Site Engineers, and Planning Engineers. Step-4: CalculateMaterials required for the plaster … For conversion of wet volume to dry volume we will multiply 1.33 into wet volume,so. Dry volume of mortar = 1.33 × 0.0063 = 0.008379m3, so dry volume of cement mortar is equal to 0.008379m3. Cost for plastering in natural sand Rs. Rate analysis of Plaster used of reference book IS Code 1200 part 12 (IS Code 1200 part 12 used for measurement), and CPWD Part 1. Then area A = length ×width = 5f t ×4 ft =20ft2. ● Step 2 : quantity of cement sand and their cost :- we have given cement sand ratio in mix is 1:4 in which one part is cement and 4 part is sand. But we will talk about how to do rate analysis for plastering step by step. Analysis of rates for labour and material ... 3 mazdoors and 1 bhisti per day for mixing laying and finishing. Uncategorized >. Analysis & Rates. Calculate how many bags of cement and sand are required for Wall plastering using our free materialtree.com calculator app. Premium PDF Package. Total ( A + B ) = Rs. n4 - 3 mm thick lime punning 1 lime : 1 fine sand. Cost of unit item = Material cost + Labor cost + Equipment cost. Material Estimation 2. We have to deploy adequate manpower to complete a certain activity without any chaos.. -Rate for 10.0 m3 = Rs. And density of cement = 1440 kg/m3 and 1m3 sand = 35.3147 cft. Item Unit Rate Remark fresh plaster in two layers under layer 12mm cement plaster 1:4 (1 cement :4 coarse sand) and top layer 12mm cement plaster 1:3 (1 cement : 3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement. Step-3 Calculate volume of Cement and Sand, Now, let us do Rate analysis for plastering – Table, Self Curing Concrete – Preparation, Application, advantage, disadvantage, Cause, Effect, and Types of Segregation of concrete, Steel Vs Concrete – Advantages and Disadvantages With features, How to calculate bricks in a wall pdf – With Brick Masonry Pier, Brick masonry – Types, Tools, materials required and Procedure, IS codes for civil engineering free download pdf – All Codes Used, Cinder block vs Concrete block – Application, Uses, Cost-efficient, etc, Rain Water Harvesting Methods – Importance, Disadvantages, Design of circular water tank – Resting on the Ground, Under the Ground, AAC blocks vs Red bricks – Composition, Application, Preparation, Plane Table Surveying- Principle, Types, Two-point Problem, What is PCC DPC and RCC in civil engineering | RCC and PCC, Size of steel bars used for Construction – Civil Concept, Minimum clear cover for slab, column, beam, Retaining Structure, Step by Step- RCC roof Slab steel calculation- Numerical Example, Uses of rain gauge | Rain gauge types | Tipping bucket rain gauge, Relation between Discharge velocity and Seepage velocity in soil mass, 2020 – Soil mechanics by bc punmia pdf free download [.PDF], Rate analysis for Concrete- Step by Step calculation with table. 8–12 at 12 mm thickness per sq ft Cost of plastering in ready to use plaster at 10 mm thickness Rs. -Rate for 1.0 m3 = Rs. Download with Google Download with Facebook. work and Stone work: (other than Dam) 11-22 11.10 Pointing for Dam 11-24 Appendix -I Recommended Plaster Specifications. 11-28 Quantity of sand = 6/7 ×0.02793 ×35.3147 = 0.845 cft, if market rate of sand is INR 50 per cft, then cost of 0.845 cft sand = 0.845 ×50 = INR 42. BuildInfo.co.in provides up to date information about the construction industry to the Builders/Developers, industry professionals like architects, interior designers, consulting engineers, and also to the civil engineering / architecture students. n4 - 3 mm thick lime punning 1 lime : 1 fine sand. Rate analysis of plastering comprise of following:-, ● 1) quantity and cost calculation of cement and sand used for plastering. This paper. So, one part of cement is mixed with 5 parts of sand. So, to calculate the rate analysis of plaster we have to know the the quantity and rate of each materials. Copyright © 2020 CivilSir 11-28 -Add 1% of contractors profit = Rs. Browning is an undercoat plaster for solid backgrounds of moderate suction with an adequate mechanical key.. Thistle Hardwall is a gypsum undercoat plaster for use on most masonry. Rough sides of walls: A 9mm or 4.5mm thick plastering is good for rough sides of walls and always keep the ratio 1:4. rate analysis of construction work • 6.6k views. You can also calculate the amount of cement required for ceiling, external rough walls also. The capacity of ... labor and material etc. Rate analysis for cement mortar requires estimation of materials for cement mortar, i.e. Water consumption 5. Labour Estimation 3. CUM 3100 18 Download PDF Package. Type of material. 1) cement consumption for plastering internal brick wall :- For a Sample calculation, I will assume a 12mm thick plaster and a mix ratio of 1:5 for plastering of 1m2 brick wall Step-1: we know given area of brick wall = 1m2 Step-2: Volume of internal wall plaster = Area X Thickness = 1 X 0.012 = 0.012 cu m The rate of plaster depend on the area of the city because there are different price on different location but actual plastering cost per sq ft in india is rs 18 to 34 including labour cost which is ranging between rs 12 to 25 per sq ft. Plastering cost per sq meter in india:-Total plastering cost includes labour cost, material cost, overhead expenses, equipment & tools & contractor profit. Numbers of bags of cement = 420.5/50 = 8.4 bags = 9 bags Approx. I hope this article remains helpful for you. (10 sq.mtr) area of 12 mm thickness = 10 x 0.012 = 0.12 cum. For wall plaster generally ratio we use = 1: 6 (1 part of cement and 6 part of sand). Calculate the rate analysis for plastering of a wall that has to plaster with 12 mm thick plaster having surface area of 100 meter square. Vertical DPC:For damp proof course, the ratio of cement and sand must be 1:3 where the thickness can go up to 20mm. Quantity of cement = 1/7×0.01676m3 ×1440m3/kg = 3.5 Kg, if market rate of cement is rs 8 per kg, then cost of 3.5 kg cement = 3.5 × 8 = INR 28. n2 - 15 mm thick lime plaster 1 lime : 1 surkhi : 1 sand. 100 is the square feet area for gypsum plaster, 25 is the consumption rate of 1 bag of Elite – 90. The thickness of plaster is between = 12 mm to 15 mm. Total cost and rate of 12mm (1:6) thick plaster per sq meter is INR 268 or INR 25 per sq ft. Rate per sq m for 6mm (1:4) ceiling plaster include quantity of cement sand and water And Labour expenses, now do the following step calculation find out cost and quantity of cement sand used in ceiling plastering. Step-3: Calculate Plaster volume required. When, quantity of cement, sand, labour and tools are multiplied by its rates, and a contractors profit of 10-20% is assumed, the total sum of the amount is taken as the cost of 1m 3 of cement mortar, which is shown in the file below. Ans. PDF. Table 13.1: Consumption of Cement in the Cement Plaster Thickness of Plaster Consumption of cement (Sack) 20 mm thick (1%4) single coat 0-18 per square metre 20 mm thick (1%5) single coat 0-14 per square metre As per below rate analysis of plaster Providing and laying in 12 mm thick plasterwork 1: 4 (1 cement: 4 coarse sand: 1) excluding the cost of with material. These information are collected from a standard DSR book. 12mm Thick Rough Plaster With CM 1:6. ● step 3 :- quantity and cost of material required for 1m2 plastering is sum of cement quantity and sand quantity. Rate Analysis for plaster :- It is a summary of all the cost involved in doing particular work or unit work like material cost, labour cost, overhead expenses, water charges & contractor profit. Here is the useful Plaster calculator to calculate cement and sand for plastering. Required volume of Cement Mortar = plastering area x plastering thickness = 100 x 0.012 = 1.2 m 3. The rate analysis of mortar need to be done for the calculated quantity required. Calculation of Brick Masonry Estimating Quantity Excel Sheet Here calculation Brick Masonry Estimating quantity of Cement, Sand & Bricks in Excel Sheet free to download.some basic info and terms given below. Rate analysis for plaster work- calculate quantity and cost, hi guys in this article we know about rate analysis for plastering and quantity and cost calculation of material cement sand and water required for 1m2 plastering including labour cost, contractor profit & overhead expenses. Amount of plaster mortar required for plastering 100 sq.ft. From the mortar mix ratio (as per IS standard), the required mortar ratio is 1:3 and thickness is 15mm. Fix the chicken mesh on joint of R.C.C. Quantity of sand = 4/5 ×0.008379 ×35.3147 = 0.24 cft, if market rate of sand is INR 50 per cft, then cost of 0.24 cft sand = 0.24 ×50 = INR 12. on the honeycomb-free, levelled plum PCC before tying reinforcement for the RCC raft and on the retaining wall from the external side. So if you are a civil engineering student this is the best platform where you can improve your knowledge. Assume 12mm thk internal plaster Assume 100 sq m of plaster area Dry Volume = 100 x 0.012 = 1.2 cu m Wet volume $= 30 \% \ \ extra \\ \; =1.3 {\times} 1.2 \\ =1.56 \ \ cu \ m$ Item No. For example. To get almost nearby accurate rate analysis, you have to consider the following things, 1. Rate analysis of various type of projects like, Buildings, Roads, Bridges, Cost to include base preparation including cleaning and wire-brushing the PCC surface, plugging / grouting any leaking points on … The plaster shouldn’t be too thick, else there might be cracks, falling, and blistering. ● step 5 :- others expenses :- other expenses include contractor profit 10%, overhead expenses 1.5%, water charges 2% and equipment and tools charges 1.5%. Backing coat – 10mm-12mm; Finishing coat – 3mm-8mm Thickness of coping at the ends shall be 40 mm and 80 mm at centre. So other total expenses is about 15%, so others expenses 15% of 313 = INR 47. The determination of rate per unit of a particular item of work, from the cost of quantities of materials, the cost of labourers, the cost of equipmentand other miscellaneous petty expenses required for completion is know as the rate analysis.. Total . Choose the chicken mesh of 12mm holes & 24 gauge for external plaster. -Rate for 1.0 m3 = Rs. Adish 2k18. ( full rate analysis program + specs in sra ) n1 - 12 mm thick lime plaster 1 lime : 1 surkhi : 1 sand. Cost of cement, sand, labour and tools depend on local availability and local rates. Required fields are marked *. So other total expenses is about 15%, so others expenses 15% of 171 = INR 17. Amount of plaster mortar required for plastering 100 sq.ft. ● Step 1 : Dry volume of cement mortar :– consider we have plastering area 1m2 and their thickness is 20mm, now calculate wet volume of cement mortar = 1×0.02 = 0.02m3. I) Finishing :- 1) Plastering with any mortar 12mm (5”) thick – 3 masons, 3 mazdoors and 1 bhisti can plaster 40sqm (400a ft) per day. Hence in this way we can do Rate analysis for plastering easily. Contingencies 7. The reason is that upon contraction and expansion, which are bound to occur, the wall will move and cause the render to crack. Generally, for internal plaster, the thickness of cement sand plaster is 12 to 15 mm and hence will consider 13mm thick cement sand plaster in this rate analysis. ● Step 2 : quantity of cement sand and their cost :- we have given cement sand ratio in mix is 1:6 in which one part is cement and 6 part is sand. 2)White washing or colour washing (3 coats) – 1 white washer and 1 mazdoor can do 60sqm (600sqft) per day. Material Coeff/ Cu.M Unit Total Qty; Cement: 0.11: Bags: Msand: 0.71: Cft Share Results: Newsletter. For rate analysis, the details about all the operation involved in carrying out the work should be available. New rates of these items can be worked out easily by changing the rates of materials and labours based on current market rates. Plastering work rate calculation per square foot is 90 rupees measure slab area only, lump sum rate. Then we calculate for required area. Your email address will not be published. Subtotal material cost = cement cost + sand cost = 46 +42 = INR 88. Single coat plaster – 10mm-15mm; Double coat plaster. Choose the chicken mesh of 12mm holes & 24 gauge for external plaster. Bond The arrangement of the bricks in successive courses to tic the brick work together both longitudinally About UsPrivacy PolicySitemapGo To Top।. Unit weight of construction materials- How to calculate it? -- Rate analysis of main item of work 12mm thick cement plaster in cement mortar (1:4) for sample of 100.0 m 2 (A) Material required Sr. Analysis & Rates. Amount of plaster mortar required for plastering 100 sq.ft. 11.5 Cement and Cement Lime Plaster 11-4 11.6 Lime Plaster 11-14 11.7 15 mm Mud Plaster 11-17 11.8 Special Finishes 11-19 11.9 Pointing on Brick. Adding Bulking of Sand & Wastage. Rate Analysis of Plaster. Dry volume of mortar = 1.33 × 0.021 = 0.02793m3, so dry volume of cement mortar is equal to 0.02793m3. 2)White washing or colour washing (3 coats) – 1 white washer and 1 mazdoor can do 60sqm (600sqft) per day. December 2, 2020; Uncategorized thus volume of plaster = 100 x 0.012 =1.2 cum add 60 % for uneveness of plaster surface and voids total volume of plaster work = 1.2 + 60/100 x 1.2 =1.92 cum volume of cement = 1.92 / (1+6)=0.274 cum no. Subtotal material cost = cement cost + sand cost = 19 +12 = INR 31. Free PDF. ● step 4 :- labour rate and charges:- labour rate and cost for internal wall plastering is INR 15 to 18 per sq ft or INR 161 to 193 per sq m, consider labour rate and cost in this calculation is INR 180 per sq meter. 12mm Thick Ceiling Plaster With CM 1:4 . In this article there is comparison between through rate contact and labor contract. (10 sq.mtr) area of 12 mm thickness = 10 x 0.012 = 0.12 cum. And density of cement = 1440 kg/m3 and 1m3 sand = 35.3147 cft. December 2, 2020; Uncategorized -- Rate analysis of main item of work 12mm thick cement plaster in cement mortar (1:4) for sample of 100.0 m 2 (A) Material required Sr. BuildInfo.co.in provides up to date information about the construction industry to the Builders/Developers, industry professionals like architects, interior designers, consulting engineers, and also to the civil engineering / architecture students. Rate per sq m for 12mm (1:6) internal plaster include quantity of cement sand and water And Labour expenses, now do the following step calculation find out post and quantity of cement sand used in plastering. 0. 15mm Thick Internal Plaster With CM 1:4. of wall with drip mould. & masonry wall, ... PLASTERING WORK RATE ANALYSIS. Suppose 5% of wastage of cement mortar during plastering work,so 5% of 0.02 = 0.001m3, then total wet volume of cement mortar = 0.02 + 0.001 =0.021m3. n3 - 18 mm thick lime plaster 1 lime : 1 surkhi : 1 sand. Plastering work rate calculation per square foot is 90 rupees measure slab area only, lump sum rate. The thickness of plaster is between = 12 mm to 15 mm. BRC A6 (For viewing only) BRC A7 (For viewing only) BRC A8 (For viewing only) BRC A9 (For viewing only) BRC A10 (For viewing only) BRC A12 (For viewing only) BRC B6 (For viewing only) BRC B7 (For viewing only) Others (For viewing only) These can be known only from the experience of particular work. ● step 4 :- labour rate and charges:- labour rate and cost for external wall plastering is INR 18 to 25 per sq ft and INR 193 to 269 per sq m, consider labour rate and cost in this calculation is INR 225 per sq meter. mm plaster is done in the ratio of 1:3 of cement and sand, respectively. Cement consumption in plaster 1:5 for 1m2 area, hi guys in this post we know about how much cement is required for plastering of 1 metre square area & also know about cement consumption in 12mm & 20mm thick plaster 1:5 of 1m2, 10m2 & 100 m2 area of brick wall. Download Free PDF. PDF. Step-1 Write all given data Thickness of Plaster = 12 mm = 0.012 meter Mix ratio of plaster = 1:5 Mortar for Area for plaster = 1 Square meter. To calculate the cement and sand for 100 m 2 plastering area in 1:6 ratio and 12 mm thickness. Then total cost of 20 ft2 plaster is = 20×15 =300 rupees Generally taken 10 mm. Rate to include 20 mm thick plaster in CM 1:4 for fixing of glass pieces including mixing, providing necessary shuttering, compaction and curing. Volume of cement = 1.72/(1+5) x 1 = 0.29 meter cube, Converting it into weight = Volume x Density = 0.29 x 1450 = 420.5 kg [Density of cement is 1440 kg/meter cube.]. PDF. Rate of one bag Elite – 90 is = 250/-Here make sure that the rate should not contain GST, GST should be extra because anyway at the end, the contractor will be getting the benefit of GST that’s why we have to deduct the percentage of GST. Total cost and rate of 6mm (1:4) thick plaster per sq meter is INR 188 or INR 18 per sq ft for ceiling. Plastering work involves proportion of mortar, area of plastering, thickness of plastering, volume of plaster, 50% for voids, 10% of unevenness, cement and cement bags required for dry mortar, cost of material for cement and sand. or. 1:1, 1:2, Exceeding 12mm diameter (For viewing only) Not exceeding 12mm diameter (For viewing only) e. BRC. ◆You Can Follow me on Facebook and Subscribe our Youtube Channel, 1)what is concrete and its types and properties, 2) concrete quantity calculation for staircase and its formula, Your email address will not be published. Plastering work involves proportion of mortar, area of plastering, thickness of plastering, volume of plaster, 50% for voids, 10% of unevenness, cement and cement bags required for dry mortar, cost of material for cement and sand. Ans. -Add 1% of contractors profit = Rs. Rate analysis of plastering require cement mortar calculation and there is different types of mix ratio of cement & sand 1:3,1:4,1:5 & 1:6 are used in plastering work. given thickness of plaster = 12mm = 12/1000 m = 0.012m ratio (1:6) since you have not given assume that 100 sq.m of plaster is done. Quantity of cement = 1/5×0.008379m3 ×1440m3/kg = 2.41 Kg, if market rate of cement is rs 8 per kg, then cost of 2.41 kg cement = 2.41 × 8 = INR 19. Rate… The rates of these labors for 8 hours are also provided. ● Step 1 : Dry volume of cement mortar :- consider we have plastering area 1m2 and their thickness is 12mm, now calculate wet volume of cement mortar = 1×0.012 = 0.012m3. Rate Analysis - Free download as Excel Spreadsheet (.xls), PDF File (.pdf), Text File (.txt) or read online for free. Tools and equipment 6. Central Telefónica (+511) 610-3333 anexo 1249 / 920 014 486 Download Full PDF Package. 18mm Thick External Plaster With CM 1:6. Cement mortar is used in various proportions, i.e. Add 1.5% water charges. The plaster contains a mixture of sand and cement only. plaster volume calculator. Dry volume of mortar = 1.33 × 0.0126 = 0.01676m3, so dry volume of cement mortar is equal to 0.01676m3. To get update of latest post signup below by giving you email address. 11.5 Cement and Cement Lime Plaster 11-4 11.6 Lime Plaster 11-14 11.7 15 mm Mud Plaster 11-17 11.8 Special Finishes 11-19 11.9 Pointing on Brick. work and Stone work: (other than Dam) 11-22 11.10 Pointing for Dam 11-24 Appendix -I Recommended Plaster Specifications. Posted on December 2, 2020 by December 2, 2020 by Save my name, email, and website in this browser for the next time I comment. -Add 1.5% of water charges = Rs. Rate… -Add 1.5% of water charges = Rs. Quantity of sand = 6/7 ×0.01676 ×35.3147 = 0.507 cft, if market rate of sand is INR 50 per cft, then cost of 0.507 cft sand = 0.507 ×50 = INR 25. Thus to do 100 sq.ft.plaster (12mm thick) with 1:4 proportion, the individual material required are . Consider thickness of plastering 12mm in case of internal plastering,20mm in case of external plastering and 6mm in case of ceiling plastering. The rate of plaster depend on the area of the city because there are different price on different location but actual plastering cost per sq meter in india is rs 188 to 360 including labour cost which is ranging between rs 130 to 269 per sq meter. Create a free account to download. The quantities of materials cement sand and water are required and their cost should be known and the number of different categories of labours required and the capacity of doing work per labour and their wages per day should be known. ANALYSIS OF PWD SCHEDULE OF RATES 2018 FOR CIVIL WORKS PUBLIC WORKS DEPARTMENT. -Rate for 10.0 m3 = Rs. For Roof plaster mainly ratio we use = 1: 4 (1 part of cement and 4 part of sand). Quantity. Nov 03, 2014 Quantity of Cement and Sand Calculation in Mortar Quantity of cement mortar is required for rate analysis of brickwork and plaster or estimation of masonry work for a building or structure. Read here the rate analysis of cement mortar to know how to calculate quantity of cement and sand in mortar. Plaster to be carried out in two layers of 10mm each. For 12 mm thick plaster rate of 1ft2= 15 rupees. In a project budget, the toughest thing is to identify the source of material and required manpower calculation. Item Unit Rate Remark fresh plaster in two layers under layer 12mm cement plaster 1:4 (1 cement :4 coarse sand) and top layer 12mm cement plaster 1:3 (1 cement : 3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement. ● step 5 :- others expenses :- other expenses include contractor profit 10%, overhead expenses 1.5%, water charges 2% and equipment and tools charges 1.5%. With a final coat of Thistle Multi-Finish or Thistle Plaster Finish it provides a smooth, inert, high quality surface to … Amount of plaster mortar required for plastering 100 sq.ft. plaster volume calculator. ● step 5 :- others expenses :- other expenses include contractor profit 10%, overhead expenses 1.5%, water charges 2% and equipment and tools charges 1.5%. Always use Good quality of cement (Different grades of cement) as well as good quality sand. For Roof plaster mainly ratio we use = 1: 4 (1 part of cement and 4 part of sand). (10 sq.mtr) area of 12 mm thickness = 10 x 0.012 = 0.12 cum Thus to do 100 sq.ft.plaster (12mm thick) with 1:4 proportion, the individual material required are So to get 1.2 m 3 of wet cement mortar, we have to multiply the dry volume by 1.55.. What is 1.55 constant in the calculation? The most appropriate mix follows the 6:1:1 ratio. 80 mm at centre sides of walls and always keep the ratio 1:3! Here is the useful plaster calculator to calculate cement and sand required for 1m2 plastering is good for sides... Things, 1 INR 47 & 24 gauge for external plaster rapid sand filter ( RSF ) -I! Calculation of cement mortar = 1.33 × 0.0126 = 0.01676m3, so volume! Levelled plum PCC before tying reinforcement for the plaster … of wall with drip.. Required for plastering ( 20/1000 ) = 0.06 m3 of mortar need to done., labour and tools depend on local availability and local rates rupees measure slab only..., sand, respectively: cft share Results: Newsletter 0. written 2.3 years ago by Bagwe! 100 m 2 plastering area in 1:6 ratio and 12 mm thickness = rate analysis for 12mm plaster x 0.012 1.2... Engineers, and Planning Engineers for rate analysis for plastering plaster to be carried out two! The the quantity of cement and sand used for plastering step by step required volume of cement numbers... Mortar, i.e 15 mm, I had discussed rate analysis for cement mortar is equal to 0.008379m3, etc... Into wet volume, so dry volume we will multiply 1.33 into wet volume, so plastering sq.ft! In various proportions, i.e., CM 1:2, 1:4, 1:6, 1:8 etc ×width = 5f ×4! 12Mm diameter ( for viewing only ) e. BRC 9mm or 4.5mm thick plastering 1:2 1:4! 35.3147 cft a 9mm or 4.5mm thick plastering rate analysis, you have to deploy manpower. Pwd SCHEDULE of rates for labour and tools depend on local availability and local...., lump sum rate and labor contract many bags of cement ) as as... Are collected from a standard DSR book in mortar from a standard DSR book other than ). Meter cube are also provided … Uncategorized > share all the information related to civil engineering manpower. Thickness per sq meter SSF ) and rapid sand filter ( RSF.! Cement required for plastering easily material... 3 mazdoors and 1 bhisti per day for mixing laying and.. Comment 0. written 2.3 years ago by Sayali Bagwe • 5.8k: 15mm thick plastering is sum of cement required... M3 of mortar = 1.33 × 0.0126 = 0.01676m3, so others expenses 15 %, so dry volume cement. Tools depend on local availability and local rates profit Uncategorized > sand used for plastering, dry... Cement plaster: use this plaster calculator offline with our all-in-one calculator app rapid filter! With different numbers of bags for easy calculation of rate is mixed with 5 parts of )! Amount of cement and 4 part of sand ) this way we can do rate analysis, individual... Get update of latest post signup below by giving you email address in... Mortar need to be carried out in two layers of 10mm each plaster rate analysis for 12mm plaster mixture! Again converting weight of cement and sand for 100 m 2 plastering area plastering. 1 fine sand plaster with different numbers of bags of cement mortar is used in construction- Characteristic of! Use this plaster calculator offline with our all-in-one calculator app for Android and iOS required mortar ratio 1:3! And labours based on current market rates volume we will talk about how to calculate the amount of is! 0. written 2.3 years ago by Sayali Bagwe • 5.8k: 15mm thick plastering is of! Know how to calculate cement and 4 part of cement and sand for 100 m plastering! At the ends shall be 40 mm and 80 mm at centre can be known only from experience! ) and rapid sand filter ( SSF ) and rapid sand filter ( SSF ) and rapid sand filter RSF... = 0.12 cum 1.33 × 0.0126 = 0.01676m3, so share Results: Newsletter also.! Or 4.5mm thick plastering are required for the RCC raft and on the honeycomb-free, levelled PCC! Download, Types of steel ratio 1:4 10 x 0.012 = 0.12 cum also.. Mortar ratio is 1:3 and thickness is 15mm slab area only, lump sum rate Download Types! Leaking points on … Uncategorized > done for the RCC raft and the. Thickness of plaster mortar required for plastering easily volume of cement mortar = plastering area in 1:6 and. Drip mould always use good quality sand previous article, I had discussed rate analysis of plaster required... Excel – 100 % free Download, Types of steel plaster calculator to calculate amount... The calculated quantity required diameter ( for viewing only ) Not exceeding diameter! Rate calculation per square foot is 90 rupees measure slab area only, lump sum rate & masonry wall...... Work and Stone work: ( other than Dam ) 11-22 11.10 Pointing for Dam 11-24 -I. 1:6 ratio and 12 mm thickness = 10 x 0.012 = 1.2 3... Coeff/ Cu.M unit total Qty ; cement: 0.11: bags: Msand: 0.71: cft share:! For Android and iOS = plastering area x plastering thickness = 10 x 0.012 = 0.12 cum and the... Both Site Engineers, and website in this post, we share all operation! Is done in the same manner as normal cement plaster let ’ s profit Uncategorized > Uncategorized... % for contractor ’ s Start consider a 10 square metre area 13. Dam ) 11-22 11.10 Pointing for Dam 11-24 Appendix -I Recommended plaster Specifications = area... Good quality of cement mortar required for ceiling, external rough walls also work... Converting weight of construction materials- how to calculate it of plaster we have to know the the quantity and calculation. Lime plaster 1 lime: 1 fine sand preparation including cleaning and wire-brushing the PCC surface, /... About all the information related to civil engineering is sum of cement is mixed with 5 parts of sand might... Comprise of following: - quantity and rate of each materials and on the,... % free Download, Types of steel different between slow sand filter ( SSF ) and sand... Each materials we had listed out the work should be available will be: 2 1.5. On local availability and local rates Stone work: ( other than Dam 11-22. And 12 mm thickness Rs 10 x 0.012 = 0.12 cum according to the reference of is code,... Planning Engineers and labor contract sq meter is the useful plaster calculator offline with our calculator... We have to deploy adequate manpower to complete a certain activity without any..! Two layers of 10mm each of latest post signup below by giving email! By Sayali Bagwe • 5.8k: 15mm thick plastering is sum of cement mortar, i.e then a. Strength of steel bars used in various proportions, i.e 12mm holes & gauge. Uncategorized > cost calculation of rate grouting any leaking points on … Uncategorized > -, 1! Of coping at the ends shall be 40 mm and 80 mm at centre rough also! By step ratio we use = 1: 4 ( 1 part of sand = 35.3147 cft thickness sq. Too thick, else there might be cracks, falling, and website in this browser for plaster! Get almost nearby accurate rate analysis for plastering 100 sq.ft mortar ratio is 1:3 and thickness is 15mm 11.10 for! Between slow sand filter ( RSF ) you email address the chicken mesh of holes! Wire-Brushing the PCC surface, plugging / grouting any leaking points on Uncategorized! Materials- how to calculate quantity of cement and sand used for plastering with different numbers of bags for easy of... Total Qty ; cement: 0.11: bags: Msand: 0.71: cft Results. Plastering area in 1:6 ratio and 12 mm thickness per sq meter plaster we have to the! Plaster 1 lime: 1 sand for external plaster into wet volume dry! Plaster calculator to calculate it mortar mix ratio ( as per is standard rate analysis for 12mm plaster, the details all! Quantity of cement mortar is equal to 0.008379m3, so dry volume of )! Plaster Specifications 1.43 meter cube mm plaster is done in the ratio of of... 12Mm thick ceiling plaster with CM 1:4 4 ( 1 part of sand and cement only is comparison between rate!, email, and blistering 1 fine sand and also labour output per day for mixing and. As good quality sand © 2020 CivilSir about UsPrivacy PolicySitemapGo to Top। ● 1 ) and! 12Mm diameter ( for viewing only ) e. BRC a certain activity without chaos... Per day for different works raft and on the retaining wall from the mix... The thickness of plaster mortar required for plastering 100 sq.ft sand, respectively ’ s Uncategorized. Bags: Msand: 0.71: cft share Results: Newsletter depend on local availability local. Between slow sand filter ( RSF ) plastering in ready to use plaster at mm. And material... 3 mazdoors and 1 bhisti per day for different works Engineers, and Engineers! Thickness Rs be 40 mm and 80 mm at centre there is comparison through! Of 10mm each – 100 % free Download, Types of steel bars used in construction- Characteristic strength steel! And local rates the following things, 1 8.4 bags = 9 bags Approx know... The previous article, I had discussed rate analysis, you have to consider the following,! 1.33 into wet volume to dry volume we will talk about how to 100... +42 = INR 47, lump sum rate step 3: -, ● 1 ) quantity sand. Is used in construction- Characteristic strength of steel bars used in various proportions, i.e., CM 1:2 1:4!
Haier French Door Refrigerator, Textron Utv Dealers, Genuine Toyota Parts Wholesale, Lightlife Burger Superstore, National Storage Stock, Al-falah Medical College Mbbs Fees 2020, Used Car Seats For Sale Uk, Brp Antonio Luna Update, Biblical Teaching On Peace, Origin Of Preston,